Looking for something?

Monday, June 13, 2016

06/08/2016 (cont'd)

There were moving blankets place on the port engine and the tank was laid down, keeping as much off the engine as possible and slid out the port door to the toe rail and onto the dock.
Chris, from Mid-Shore Electronics who are doing the work, I don't think he thought that they'd be doing this type of work. After the first tank was removed then it was time to take out the second one.
You can see some 'diapers' in the lower part of the pictures. The second tank was removed the same way as the first.



No comments:

Post a Comment