Had to remove a breaker for the battery charger. Needs to be a 30A size.
Chris working on the NAV items in the wiring closet.
Here's the AIS in place under the front cowling.
Here's the pump for the autopilot. It was placed below the main wiring in the wiring closet.
Composite Yacht, they are installing the Glendinning synchronizer, stopped by for some measurements. I'm having them do some engine work so I can learn a few things. Never learned how to bleed a diesel after fuel filters are changed so this is a chance to do that.
Here's the flybridge with the chartplotter installed along with the autopilot control.